Products
  • Description
  • Additional Information





  Construction time

Steel structure installation completed in 1 day,and the project



  Anti-rust treatment

Rust removal,degreasing,13 procedures,electrophoreic dipping (domesic initiatve)



  Well size

Optimized design,small footprint, small impact on low-rise residental lighting